New container terminal boosts capacity at Mombasa Port

[dropcap]C[/dropcap]ompletion of phase one of the Second Container Terminal helped increase Mombasa Port’s annual capacity by 550,000 TEUs, Kenya Ports managing director Daniel Manduku has announced.

Mr Manduku also said that upon completion of the second phase of the second container terminal, Mombasa Port will have an additional capacity of 450,000 TEUs giving it a total capacity of one Million TEUs.

He spoke during a tour at the Port of Mombasa to witness the progress of the ongoing construction of the second phase of the Second Container Terminal.

“Normally in the maritime sector the one Million TEUs is very high threshold and I am happy to note that almost four months before the close of the year we have attained it. Going by our daily handling of between 3500 TEUs and 4000 TEUs simple arithmetic tells us that we might even surpass 1.4 million TEUs,” said Dr. Manduku.

He expressed satisfaction with the performance at the Nairobi Inland Container Depot saying it has continued to record high efficiency levels.

“A year ago the cargo dwell time at the container depot was 23 days. Today I am happy to note that 80 percent of all cargo is leaving the Inland Container Depot within four days and our average dwell time has gone down to below six days. This is because of the efforts by both Government agencies and private sector in ensuring that we make business smooth and efficient.”

In terms of cargo evacuation from the Port of Mombasa to the Inland Container Depot Nairobi by the Standard Gauge Railway (SGR), Dr. Manduku said currently there’s an average of 8 to 10 trains each carrying 108 containers daily.

Read Also

Namibia opens new port terminal at Walvis Bay

theafricalogistics

Recent Posts

Union Pacific and Norfolk Southern in Advanced Merger Talks: A New Era for U.S. Freight Rail?

In a potential game-changing development for the U.S. freight rail industry, Union Pacific (NYSE: UNP)…

5 days ago

Student Loan Forgiveness Under IBR Paused Amid System Overhaul, But Not Canceled

The U.S. Department of Education has confirmed a temporary pause in processing student loan forgiveness…

1 week ago

Telkom Unveils New Logo and Brand Identity in Strategic Repositioning Drive

Telkom has officially unveiled its refreshed logo and visual identity as part of a broader…

1 week ago

Alaska Airlines Resumes Flights After Nationwide Grounding Caused by IT Outage

Alaska Airlines has resumed flight operations after a widespread IT outage forced the temporary grounding…

1 week ago

Top New Online Slots to Keep an Eye Out for in July 2025

If you’re aged 18 or above, live in South Africa, enjoy playing feature-rich online slot…

2 weeks ago

FlySafair Braces for Turbulence as Pilots Threaten Strike Over Wage Dispute

FlySafair, one of South Africa’s top low-cost carriers, is preparing for possible disruptions as its…

2 weeks ago